The realtor called a
couple of hours after the handyman left.
I told him our little of meeting and that we all needed to get on the same
page. He agreed and reveled that this
was not his normal handyman. His normal
handyman passed away recently and we are apparently a guinea pig for this one. He said he would call him and set up a
meeting so we can all get together to go over what needs to be done. He also gave me the code so I could get the
keys our of the lock box. Now I can lock
up the house and go grab something to eat.

With the first coat of
primer on in one room, it was time to start working on the upstairs
bathroom. Know it sounds silly, but the
first thing was to clean the entire bathroom.
This is so I have a cleaner place to work, it allows the painters tape
to stick to surfaces, and will make the clean up from the mess I am about to
make painting that much easier.
After
the bathroom was clean, it was late and time to hit the sack. Literally.
The bed is a sleeping bag and pillow on a blanket on the floor. This time I was awake enough to pull out the Therm-a-Rest
and put that down for some padding.
The sleeping situation is not going to change until I get home.
No comments:
Post a Comment